| 1 |
Compare the complete installed cost |
Machine price, freight, rigging, installation, commissioning, operator training, and any required electrical or safety work. |
Initial cost = purchase price + delivery + installation + commissioning + training. Compare quotes on the same scope and currency basis. |
Check whether warranty coverage starts at shipment, delivery, or commissioning, and whether installation must be performed by an authorized technician. |
An itemized quotation, installation scope, delivery estimate, and written list of excluded charges. |
| 2 |
Match the machine to the coil range |
Supported coil dimensions, wire sizes, lacing patterns, tie spacing, insulation types, and changeover requirements. |
Include the cost of extra guides, fixtures, needles, tooling, and setup time for each required product family. |
Ask whether defects caused by unsupported materials, tooling changes, or operation outside stated limits are excluded. |
A written specification sheet and a demonstration using representative production coils and lacing materials. |
| 3 |
Measure usable production capacity |
Cycle time, setup and changeover time, operator involvement, and actual output quality—not just the fastest quoted cycle. |
Annual scheduled hours = shifts per day × hours per shift × working days per year. For example, 2 shifts × 8 hours × 250 days = 4,000 scheduled hours; adjust for breaks, setups, and downtime. |
Determine whether warranty remedies cover only defective parts or also labor, travel, and repair time that can affect production. |
A timed acceptance test, agreed product mix, sample output, and documented pass/fail criteria. |
| 4 |
Calculate recurring operating costs |
Lacing wire or cord, needles, guides, other wear parts, routine maintenance, energy use, and operator time. |
Annual operating cost = consumables + planned maintenance parts + energy + labor attributable to the machine. Use your own usage rates and supplier prices. |
Check whether consumables and normal wear items are excluded, and confirm whether using approved third-party materials affects coverage. |
A consumables list, recommended replacement intervals, maintenance schedule, and expected energy requirements. |
| 5 |
Price downtime and service access |
Local technician availability, response time, remote support, spare-parts lead times, and service-hour coverage. |
Estimated downtime cost = expected downtime hours × your cost per production hour. Add service travel, labor, and expedited freight where applicable. |
Compare response commitments with actual warranty obligations; a warranty does not necessarily guarantee a repair time or loaner machine. |
Written service-level details, escalation contacts, spare-parts availability information, and any service or travel fee schedule. |
| 6 |
Read the warranty scope, not just its duration |
Coverage period, covered assemblies, parts and labor, travel costs, repair or replacement process, and any separate coverage for controls or motors. |
Compare likely out-of-pocket repair costs after considering exclusions, deductibles, shipping, and service labor—not the warranty term alone. |
Confirm the start date, claim procedure, required maintenance records, exclusions, transferability, and whether repaired or replaced parts receive remaining or renewed coverage. |
The complete written warranty document and sample service-claim process before placing an order. |
| 7 |
Compare TCO over the same ownership period |
Use the same evaluation period, production assumptions, maintenance scope, and end-of-life assumptions for every option. |
Example framework: TCO = installed cost + operating costs + maintenance + downtime and repair costs − expected residual value. A 3-year comparison at 4,000 scheduled hours per year would cover 12,000 scheduled hours. |
Check whether warranty coverage overlaps the chosen evaluation period and identify costs that remain payable during the coverage term. |
A side-by-side cost worksheet with documented assumptions, quoted prices, warranty terms, and sensitivity checks for downtime or consumable use. |